Keeping an orbital data center running through a 21-minute eclipse is a different design problem from keeping it safe through a 24-hour power failure. In an arXiv preprint, Slava Turyshev of NASA’s Jet Propulsion Laboratory calculates that the distinction can change which power system is lightest. For a one-megawatt computing cluster, a compact fission system could weigh about 10 metric tons less than a system using conventional solar arrays. But if the cluster must retain 20% of its power for a full day after its main supply fails, a combination of fission and solar comes out lighter than either source alone.
What a reactor saves—and what it still has to cool
In the orbit Turyshev analyzed, the cluster could spend up to 21 minutes in Earth’s shadow on each of roughly 15 daily passes during some seasons. That adds up to about five hours and 13 minutes without sunlight per day. By his estimate, supplying one megawatt through a single eclipse requires 6.46 metric tons of batteries. With solar arrays and radiators included, the total reaches about 43 metric tons before any computing hardware is counted.
A reactor dispenses with the solar arrays and eclipse batteries, but it introduces a second cooling problem. At the assumed 25% conversion efficiency, producing one megawatt of electricity also generates about three megawatts of waste heat. A relatively compact radiator can shed that heat at around 700 kelvin. The processors, however, need to stay below about 320 kelvin and require a separate cooling system. Switching to fission reduces the low-temperature radiator area by only about 6% in Turyshev’s model.
The reactor also exposes the computers to neutrons and gamma rays in addition to the radiation they already encounter in orbit. Mounting the reactor on a long boom and placing a shield between it and the servers could reduce exposure, but the boom and its cables erode the mass advantage. Lighter next-generation solar arrays could erase that advantage altogether. Another solar option in the analysis is an orbit at 1,450 kilometers that keeps the cluster in sunlight, avoiding the need for eclipse storage. The trade-offs include debris, trapped radiation and higher power requirements for communications.
When a second power source earns its mass
For the 24-hour failure scenario, Turyshev estimates that a system supplying 80% of its power from fission and 20% from solar would weigh about 36 metric tons. That is roughly one-third the mass of either standalone system designed to meet the same backup requirement: relying on one source means carrying enough batteries to maintain safe-mode operations during the outage. Without that requirement, either standalone design is lighter than the hybrid.
Reactor lifetime matters to the launch-cost comparison. Turyshev’s analysis calls for moving a spent reactor to a graveyard orbit at about 2,000 kilometers rather than allowing it to reenter the atmosphere. He estimates that a reactor lasting 10 years would save about $190 per kilowatt-year in launch costs relative to solar. If it lasted only two years, fission would instead cost an additional $783 per kilowatt-year. Those figures are modeled launch costs, not measured operating costs or estimates of the total cost of an orbital data center.